All radiators are assembled to order. The radiators are built in stages which involves spray painting the sections before assembly, these are allowed to dry before being assembled.
Once assembled the radiators are tested to a pressure of 8bar over 24hrs before being sent back to the spray shop for a finishing coat. This again has to dry before wrapping and despatch.
The whole process takes approx. 1 - 2 weeks, longer during busy periods or for specific paint requests which have to be sourced from the paint manufacturer.
Occasionally radiators can fail the pressure test which means the radiator needs to be reassembled and adds to the time frame.
Therefore we cannot guarantee delivery dates.